Back to top

Archaeological Assessment of a Grady County Resurfacing Project

Author(s)
Report Number
10708
Year of Publication
2005
Abstract

This proposed project is the milling, leveling and resurfacing of SR 111 beginning at M.P. 22.40 and ending at the Grady/Thomas County Line. All work will take place within the existing right-of-way with no new right-of-way required. Total project length is approximately 9.044 miles. Pursuant to the February 2000 Memorandum of Understanding (MOU) between the Federal Highway Administration (FHW A), the State Historic Preservation Officer of the Georgia Department of Natural Resources (SHPO), and the Georgia Department of Transportation, this project is considered an undertaking as defined in 36 CFR 800.16{y), however, it has been determined there is no potential to affect historic properties included in or considered eligible for inclusion in the National Register of Historic Places.