Back to top

Archaeological Assessment of a Bibb County Resurfacing Project

Author(s)
Report Number
10718
Year of Publication
2005
County
Abstract

This project consists of the milling, patching, resurfacing and shoulder building on SR 22/US 80 beginning 103 ' east of the bridge over Echeconnee Creek (M.P. 0.02) and ending on the east side of the bridge over Tobesofkee Creek (M.P. 6.60) . All work will take place within the existing right-of-way with no new right-of-way required. Total project length is approximately 6.6 miles Pursuant to the February 2000 Memorandum of Understanding (MOU) between the Federal Highway Administration (FHW A), the State Historic Preservation Officer of the Georgia Department of Natural Resources (SHPO), and the Georgia Department of Transportation, this. project is considered an undertaking as defined in 36 CFR 800.16(y), however, it has been determined there is no potential to affect historic properties included in or considered eligible for inclusion in the National Register of Historic Places.