Back to top

Archaeological Assessment of the Gwinnett and Barrow Counties Resurfacing Project

Author(s)
Report Number
9809
Year of Publication
2003
Abstract

Archeological Assessment of the Gwinnett and Barrow Counties Resurfacing Project. This proposed project is 2.84 miles long and consists of patching, leveling, resurfacing, shoulder building, and guardrail installation on SR 8 beginning 5 12' south of Freeman's Mill Road (MP 21.09) in Gwinnett County and ending at Etheridge Road (MP 1.73). No additional right-of-way is required.

Pursuant to the February 2000 Memorandum of Understanding (MOU) between the Federal Highway Administration (FHW A), the State Historic Preservation Officer of the Georgia Department of Natural Resources (SHPO), and the Georgia Department of Transportation, this project is considered an undertaking as defined in 36 CFR 800.16(y), however, it has been determined there is no potential to affect historic properties included in or considered eligible for inclusion in the National Register of Historic Places.