Back to top

Archaeological Assessment of Project BRF-036-1(9), Bacon County

Author(s)
Report Number
11235
Year of Publication
1985
Abstract

40’ x 22’ bridge with timber piling. A 400’ x 40’ concrete bridge will be required on existing alignment. The proposed project will be constructed within existing row.