Abstract

The proposed project begins approximately 800 feet west of Sweetwater Creek and ends approximately 400 feet east of the stream crossing. The new structure would be 200 feet long by 40 feet wide shifted alignment approximately 30 feet downstream of the existing structure. The existing grade would be raised 10 feet to clear the 100 year flood stage. Proposed right of way is 80 feet (20 additional feet). The project would be stage constructed using the existing bridge as a detour route.