2nd Addendum to the Intersection Improvements at State Route (SR) 155/East Broadway St. and North Hill Street in Griffin

Report Number
12431
Year of Publication
2018
County
Abstract

The proposed project will change the intersection of SR 155/North Hill Street, SR 155/East Broadway Street, CS 104705/West Broadway Street, and CS 102005/North Hill Street from a two-way stop-controlled intersection to a signalized intersection. Broadway Street will be widened to the south to include a left-turn lane in both directions. Construction along Broadway will start approximately 478 feet (ft.) before the intersection and end approximately 678 ft. after the intersection. The project will tie into the limit of construction of the neighboring proposed LCI project (Pl #0010333), at the Broadway Street edge of pavement. Along SR 155/North Hill Street, construction will start just south of the railroad crossing and will consist of replacing in place the median, curb and gutter, and sidewalks, as well as the placement of a signal loop. As part of the installation of a new traffic signal at this intersection, strain poles, control boxes, ADA compliant wheelchair ramps, and cross walks will be installed. Permanent easement is anticipated in the southeast and southwest quadrants of the intersection; this easement has a maximum width of approximately 25 feet.