Archaeological Assessment of Project BRF-30-2(6), Sumter and Crisp Counties

Author(s)
Report Number
12795
Year of Publication
1980
County
Abstract

Construct 2240' x 48' concrete bridge to replace existing bridge. 380' of the existing bridge will be removed at the main channel. The remainder will be retained for use by Crisp county or Department of Natural Resources for Recreational purposes. Place approximately 78,514 cubic yards of fill material below the 100-year flood elevation covering approximately 3 acres. Fill material will be obtained from high land sources in the vicinity of the project. Erosion control will be grassing on shoulders and slopes, baled straw and stone dumped rip rap as shown on attached detail.