Back to top

Cellco Partnership and its controlled affiliates doing business as Verizon Wireless (Verizon Wireless- PAT COLWELL- A/FUZE #5037757-Trileaf Project #638633

Author(s)
Report Number
12850
Year of Publication
2018
County
Abstract

Trileaf Corporation is in the process of completing a NEPA Review at the referenced property. Our client proposes to construct a 199-foot monopole communications tower and associated equipment within a 100-foot by 100-foot (10,000 square feet) lease area. The project includes an access/utilitv easement. measuring approximately 30 feet wide extending approximately 204 feet northeast away from the lease area towards Pat Colwell Road. The proposed access & utility easement is currently located in a grass-covered and partially wooded area. and the proposed tower compound lease area is located in a grass-covered field. The antenna will be licensed by the Federal Communications Commission (FCC). In accordance with the Nationwide Programmatic Agreement for Review of Effects on Historic Properties for Certain Undertakings Approved by the Federal Communications Commission, dated September 2004, a cultural resource investigation has been conducted. Our investigation includes determining if the site is contained in, on, or within the view shed of a building, site, district, structure or object, significant in American history, architecture, archeology, engineering or culture, that is listed, or eligible for listing on the State or National Registers of Historic Places, or located in or on an Indian Religious Site.