Back to top

Addendum to Archeological Survey for the Proposed Replacement of the SR 47 Bridges over Harden and Headstall Creeks, Taliaferro and McDuffie Counties, Georgia

Author(s)
Report Number
3088
Year of Publication
2003
Abstract

The project would replace the aging SR 47 bridges over Headstall Creek south of Avondale, Georgia. The new bridge would be wider than the existing bridge, but would still consist of two lanes. The new bridge would be built in the same location as the existing bridge, while traffic was maintained on a temporary, on-site detour immediately to the north.