Back to top

Georgia Supplemental Phase I Cultural Report

Author(s)
Report Number
3212
Year of Publication
2005
Abstract

This report presents the results of supplemental Phase I cultural resources surveys and archeological inventories associated with the proposed Cypress Pipeline Project in 2005. The Cypress Pipeline Project originally was designed to include approximately 193 km (120 mi) of 24-inch natural gas pipeline constructed as a contiguous segment that extended through portions of Chatham, Bryan, Liberty, Long, McIntosh, Glynn, Wayne, Camden, and Charleton Counties in Georgia. A total of 18 cultural loci or sites were encountered within or adjacent to the Areas of Potential Effect examined during 2005.