Archaeological Reassessment of Project STP-186-1(122), Douglas & Fulton County

Author(s)
Report Number
3629
Year of Publication
2006
County
Abstract

This proposed project was originally surveyed with concurrence received in 1997. The original project remains the same except for the following changes: the median width has increased by 4'; the existing bridge over the Chattahoochee will be widened to carry four lanes with a 24' raised median; the project has been lengthened 3000' to the east of Fulton Industrial Boulevard; and numerous driveway easements and sediment basins have been added along the project corridor varying in length from approximately 20' to 3000' and in width from 10' to 150'. No existing or eligible National Register resources were located within the project's area of potential environmental effect.