Phase I Archaeological Survey for the Navigator ATMS Expansion on SR 400 (Turner McDonald Parkway), Fulton & Forsyth Counties, Georgia

Author(s)
Report Number
3647
Year of Publication
2006
Abstract

The proposed project would consist of the installation of the GDOT NaviGAtor system along SR 400 from the SR 120/Old Milton Parkway interchange to the SR 20/Buford Highway interchange for a total of 12 miles. Included in the proposed project would be four changeable message signs (CMS), vehicle detection coverage (VDC), closed circuit television cameras (CCTV), fiber optic trunk lines, and ramp meters. This project would extend the fiber trunk line along SR 400 from SR 120/Old Milton Parkway to the northern project limit at SR 20/Buford Highway. No archaeological sites were found.