Back to top

Phase I Archaeological Survey of SR 1/US 27 and SR 166 Interchange Reconstruction Project Area, Carroll County, Georgia

Author(s)
Report Number
3859
Year of Publication
2007
County
Abstract

Project Location and Area of Potential Effect

County(ies): Carroll

USGS Quadrangle(s): Carrollton, GA

Project Description: The proposed project would consist of overpass improvements and interchange modifications to the existing interchange of SR 1/US 27 with SR 166 in the City of Carrollton. The proposed project may involve widening each of the northbound and southbound bridges to add a left-turn lane. The existing bridges were constructed in 1977 and are of an undistinguished type with steel supports and concrete decks and substructures.