Back to top

Phase I Archaeological Survey of Sumter County Signal Upgrade Project Areas

Author(s)
Report Number
3964
Year of Publication
2007
Abstract

Project DescriptionThe proposed project would consist of intersection improvements at two locations in Sumter County, Georgia. The proposed project would improve the overall efficiency and safety of traffic flow due to upgraded traffic signal displays and state-of-the-art traffic signal control equipment and improve pedestrian safety with improved crosswalks, pedestrian signals and sidewalk ramps where appropriate at the following intersections: Intersection No. 1: SR 3 (US 19) @ SR 27 (US 280) (north junction) Intersection No. 2: SR 3 (US 19) @ SR 30 / West Patterson Street Area of Potential Effect. The APE for the project includes everything within the proposed construction project length and within the maximum extent of the existing right-of-way as described above.