Back to top

Archaeological Assessment of Project STP-0609(14), Pierce/Appling Counties

Report Number
4620
Year of Publication
1996
County
Abstract

The proposed project would consist of the paving of the existing shoulders on SR 15 between the cities of Bristol and Baxley. The project would begin at the intersection of SR 32 in the city of Bristol and end at the intersection of CR 202 in the city of Baxley. An archaeological survey consistent with the project description was conducted along the entire project corridor. An archaeological survey (Level I) was conducted in accordance with "GDOT/FHWA Cultural Resource Survey Guidelines" developed by the GDOT Staff Archaeologists in consultation with DNR Historic Preservation Section Staff and concurred in by the Federal Highway Administration and State Historic Preservation Officer. These guidelines provide general survey boundaries and methodological approaches to archaeological surveys based on the type/scope of proposed highway projects and are followed during the initial identification of archaeological resources.