The proposed project would involve the encasing of the existing steel H-beams in concrete to strengthen the bridge supports at locations throughout the state. Existing right-of-way is approximately 30.5 m (100 ft). All construction will be limited to the existing right-of-way. No existing or eligible National Register archaeological resources were located within the project's area of potential environmental effect.