Back to top

Archaeological Assessment of Project FR-064-1(25), Chatham County

Author(s)
Report Number
5123
Year of Publication
1996
Abstract

The proposed project will provide an additional passing lane between M.P. 28.5 and 30.9. The project will be completed within the existing 150 feet of rightof-way. A 150 foot corridor was surveyed for the length of the 1.4 mile project. An archaeological survey (Level I ) was conducted in accordance with "GDOT Archaeological Survey Guidelines" developed by the GDOT Staff Archaeologists in consultation with DNR Historic Preservation Section Staff and concurred in by the Federal Highway Administration and State Historic Preservation Officer. These guidelines provide general survey boundaries and methodology approaches to archaeological surveys based on the type/scope of proposed highway projects and are followed during the initial identification of archaeological resources. No significant archaeological resources were located within the proposed project corridor as described in paragraph two above. It is concluded, therefore, that the project will have no effect upon archaeological resources on or eligible for inclusion in the NRHP provided that the project conforms to that described above.