Back to top

Archaeological Survey of Project PI #0009834, Cobb County

Report Number
5963
Year of Publication
1995
County
Abstract

The project would consist of emergency repairs, consisting of the repair of erosion, at the bridge abutment for the bridge on SR 176 over Allatoona Creek in Cobb County (see attached location map). Repairs' will include grading and rip rap placement. No additional right-of-way will be required for project implementation, and land disturbance will be less than 1 acre, for temporary staging and work area access only. An archeological survey consistent with these project specifications was performed within the project corridor. An archeological survey (Level 1) was conducted in accordance with "GDOT/FHWA Cultural Resource Survey Guidelines" developed by the GDOT Staff Archeologists in consultation with DNR Historic Preservation Division Staff and concurred in by the Federal Highway Administration and State Historic Preservation Officer. These guidelines provide general survey boundaries and methodological approaches to archeological surveys based on the type/scope of work of proposed highway projects and are followed during the initial identification of archaeological resources. By agreement, since no archaeological resources were located within the project's area of potential effect, no signed concurrence form the State Historic Preservation Officer is required. It is concluded, therefore, that the project will have no effect upon archaeological resources on or eligible for inclusion in the NRHP provided that the project conforms to that described above.