Back to top

Archaeological Reassessment of Project BHF-038-2(40), Emanuel/Burke County

Author(s)
Report Number
6475
Year of Publication
2003
Abstract

The proposed project was originally surveyed with concurrence received in 2002, then reassessed with concurrence received in 2003. The original project remains the same except for the following: approximately 0.192 acre of new right-of-way is required on the east side of SR 36 for the construction of the new bridge. An archeological survey (Level II) was conducted in accordance with "GDOT/FHWA Cultural Resource Survey Guidelines" developed by the GDOT Staff Archeologists in consultation with DNR Historic Preservation Division Staff and concurred in by the Federal Highway Administration and State Historic Preservation Officer. These guidelines provide general survey boundaries and methodological approaches to archeological surveys based on the type/scope of work of proposed highway projects and are followed during the initial identification of archaeological resources. No existing or eligible National Register resources were located within the project's area of potential environmental effect. It is concluded, therefore, that the project will have no effect upon archeological resources on or eligible for inclusion in the NRHP provided that the project conforms to that described above.