Back to top

Archaeological Assessment of Project N-H-034-3(35), Houston and Bibb Counties

Author(s)
Report Number
7229
Year of Publication
1998
County
Abstract

In compliance with Section I 06 of the National Historic Preservation Act of 1966 and amendments thereto, project NH-034-3(35), Houston and Bibb Counties has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRHP)". The purpose of the survey was to locate, identify and evaluate the significance of any archaeological resources within the proposed project's area of potential environmental effect. Project NH-034-3(35) would widen and reconstruct SR 247/US 129 beginning at Green Street in Houston County and terminating at US 41 in Bibb County. The existing right-of-way is 150 feet. All construction for the proposed project will be restricted to the existing right-of-way. The project's total length is 8.72 miles. An archaeological survey consistent with the proposed project description was conducted along the entire length of the project corridor. An archaeological survey (Level II) was conducted in accordance with "GDOT/FHW A Cultural Resource Survey Guidelines" developed by the GDOT Staff Archaeologists in consultation with DNR Historic Preservation Section Staff and concurred in by the Federal Highway Administration and State Historic Preservation Officer. These guidelines provide general survey boundaries and methodological approaches to archaeological surveys based on the type/scope of proposed highway projects and are followed during the initial identification of archaeological resources. No existing or eligible National Register archaeological resources were located within the project's area of potential environmental effect. It is concluded, therefore, that the project will have no effect upon archaeological resources on or eligible for inclusion in the NRHP provided that the project conforms to that described above.