3673 Pietak, Lynn Marie Addendum to Archaeological Survey of the Proposed Replacement of the SR 120 Bridge over the Silver Comet Trail in Paulding County, Georgia

The project area consists of an additional .35 acre of right-of-way for the SR 120 Bridge Replacement over the Silver Comet Trail. The study area is northeast of the intersection of the Silver Comet and SR 120.

Paulding 2006
3679 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of Signal Design Project Areas in Walker and Whitfield Counties, Georgia

This is the Addendum to Phase I Archaeological Survey of Signal Design Project Areas in Walker and Whitfield Counties, Georgia. The original project consisted of reconstructing the existing signalization at 16 intersection locations in Whitfield and Walker counties.

Walker 2006
3680 Pietak, Lynn Marie Second Addendum to Phase I Archaeological Surevy of CR 107/Howell Bridge Road Over Sharp Mountian Creek, Cherokee County, Georgia

Second Addendum to Phase I Archaeological Survey of CR 107/Howell Bridge Road Over Sharp Mountain Creek, Cherokee County, Georgia.

Cherokee 2006
3681 Pietak, Lynn Marie Second Addendum to the Archaeological Survey for the Proposed Replacement of the SR 126 Bridge over Little Creek, Wheeler County, Georgia

Second Addendum to the Archaeological Survey for the Proposed Replacement of the SR. 126 Bridge over Little Creek, Wheeler County, Georgia.

Wheeler 2006
3683 Pietak, Lynn Marie Second Addendum to Phase I Archaeological Survey of Columbia Drive, Covington Highway, and Mountain Industrial Boulevard Signal Design Project Areas, DeKalb County, Georgia

Addendum to Phase I Archaeological Survey of Columbia Drive, Covington Highway and Mountain Industrial Boulevard Signal Design Project Areas, DeKalb County. The proposed project would consist of traffic signal upgrades at 34 intersections within DeKalb County, Georgia.

DeKalb 2006
3684 Pietak, Lynn Marie Addendum to the Phase I Archaeological Survey of the rpoposed Bridge Replacement at Hembree Road over Foe Killer Creek, Fulton County, Georgia

Addendum to the Phase I Archaeological Survey of the Proposed Bridge Replacement at Hembree Road over Foe Killer Creek, Fulton County, Georgia. The following changes have been made since the CE was signed: 1. The project length has decreased from 0.21 mile to approximately 0.18 mile. 2.

Fulton 2006
3687 Pietak, Lynn Marie Addendum to the Phase I Archaeological Survey of the Montgomery Bridge Replacements, Milledgeville, Baldwin County, Georgia

CSNHS-M003-00(044) is a proposed bridge maintenance project for five structures along I-20 in Fulton County. The project would consist of milling and/or hydrodemolition of the bridge decks, and replacing some of the edgebeams.

Baldwin 2006
3688 Silliman, Garrett W., Pietak, Lynn Marie Phase I Archaeological Survey of Three Interchange Modifications Along I-75, Cook County, Goergia

In June 2006, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey at three locations along I-75 in Cook County, Georgia.

Cook 2006
3693 Pietak, Lynn Marie Addendum to the Phase I Archaeological Survey of the Holly Street at Hickory Road Intersection, Cherokee County, Georgia

Original: The proposed project is an intersection improvement project in Cherokee County at Holly Street and Hickory Road in Holly Springs, Georgia. The purpose of this project is to realign approximately 700 feet of Holly Street to intersect Holly Springs Parkway at Hickory Road.

Cherokee 2006
3697 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of Two Intersection Improvements, Lowdnes County, Georgia

Project Changes Since Original Report: 1. Intersection of CR 485 River Street and SR 133/St. Augustine Road- a. Decrease in Temporary Easement (TE) along the north and south side of CR 485 east and west of the intersection b.

Lowndes 2006