10506
|
Duff, Eric Anthony, Lotti, Teresa Ann
|
Archaeological Assessment of Project PR-133-4(221), Oglethorpe County
|
Archaeological Assessment of Project PR-133-4(221), Oglethorpe County, grading, draining, and surfacing of CR 133. The entire length of the project is 0.95 mile. The existing right-of-way is 80 feet. No additional right-of-way will be required.
|
Oglethorpe
|
2001
|
10575
|
Lotti, Teresa Ann
|
Archaeological Assessment of Project STP-005-2(19), Bibb County
|
Project STP-005-2(19) would widen SR 19/US 41 in Lamar County, Georgia. The project would also include intersection improvements at CR 63 and CR 64. The project begins at the Lamar/Monroe County line and terminates approximately 0.38 mile east of the SR 19/US 41 /CR 64 intersection.
|
Bibb
|
2002
|
10597
|
Duff, Eric Anthony, Lotti, Teresa Ann
|
Archaeological Reassessment of Projects EDS-72(28)(39), Madison and Elbert Counties
|
"In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, projects EDS-72(28)(39), Madison and Elbert Counties have been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of His
|
Madison
|
2002
|
10645
|
Lotti, Teresa Ann
|
Archaeological Assessment of a District 6 Maintenance Improvement Project, Paulding and Polk Counties
|
The proposed project would consist of resurfacing, milling, shoulder building, rumble strips, and striping activities on SR 101 in Paulding and Polk Counties, Georgia.
|
Paulding
|
2008
|
10651
|
Lotti, Teresa Ann, Duff, Eric Anthony
|
Archaeological Assessment of Project Love's Truck Stop, Haralson County
|
"In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments
|
Haralson
|
2003
|
10682
|
Duff, Eric Anthony, Lotti, Teresa Ann
|
Archaeological Assessment of Project STP-M001-00(270), Camden and Glynn Counties
|
Paving two feet of existing shoulder on each side of SR 25, as well as leveling and resurfacing a portion SR 25 beginning at the Florida state line in Camden County and ending at milepost 2.15 in Glynn County. The entire length of the project is 34.141 miles.
|
Camden
|
2001
|
10730
|
Lotti, Teresa Ann
|
Archaeological Assessment of Project STP-M001-00(73), Miller and Early Counties
|
Archaeological Assessment of Project STP-MOOl-00(773), Miller and Early Counties, paving two feet of existing shoulder on each side of SR 45, as well as resurface a portion SR 45 and 45 Connector in Miller and Early Counties, Georgia. The entire length of the project is 18.32 miles.
|
Early
|
2002
|
10746
|
Lotti, Teresa Ann
|
Archaeological Assessment of Project STP-M001-00(772), Decatur and Baker Counties
|
Archaeological Assessment of Project STP-MOOl-00(772), Decatur and Baker Counties, paving two feet of existing shoulder on each side of SR 253, as well as resurface a portion SR 253 in Decatur and Baker Counties, Georgia. The entire length of the project is 18.63 miles.
|
Baker
|
2002
|
10760
|
Lotti, Teresa Ann
|
Archaeological Assessment of Project CSSTP-M002-00(577), Dodge County
|
Archaeological Assessment of Project CSSTP-M002-00(577), Dodge County paving two feet of existing shoulder on each side of a portion of SR 30/US 280 in Dodge County, as well as leveling and resurfacing a portion SR 30/US 280 beginning at the Wilcox/Dodge County Line and ending at the Dodge/Telfai
|
Dodge
|
2003
|
10877
|
Lotti, Teresa Ann
|
Archaeological Assessment of Project STP-M001-00(273), Laurens County
|
Archaeological Assessment of Project STP-MOO 1-00(273), Laurens County, paving two feet of existing shoulder on each side of a portion of SR 19 in Laurens County, as well as leveling and resurfacing a portion SR 19 beginning at the Wheeler/Laurens County Line and ending at the SR 19/US 80/SR 26 i
|
Laurens
|
2002
|