Back to top

Whitacre, Stacey R.

Report Number Author(s) Title Abstract Summary County Year
14401 Whitacre, Stacey R. Phase I Cultural Resources Survey of the Banks Crossing-Gordon Farms 115kV Transmission Line

Between March 1 and 5, 2021, Brockington and Associates, Inc.

Banks County, GA 2021
14402 Whitacre, Stacey R. Phase I Cultural Resources Survey of the Waycross-Brunswick Highway Substation

Between April 29 and May 12, 2021, Brockington and Associates, Inc.

Glynn County, GA 2021
14425 Whitacre, Stacey R. Phase I Cultural Resources Survey of the Gravelly Creek Substation

Between March 1 and 5, 2021, Brockington and Associates, Inc.

Jackson County, GA 2021
14683 Whitacre, Stacey R., Butler, C. Scott Phase I Archaeological Survey of the Winder-Augusta Fiber Replacement Project

Between December 10, 2018 and March 6, 2020, Brockington and Associates, Inc. (Brockington) conducted a Phase I archaeological survey of the 137.1-mile (220.64-km) Winder-Augusta Fiber Optic Replacement Project corridor on behalf of Georgia Power Company (GPC).

Richmond County, GA 2020
14684 Whitacre, Stacey R. Phase I Cultural Resources Survey of the Porter Padmount

Between May 18-19, 2021, Brockington and Associates, Inc. (Brockington) completed a Phase I cultural resources survey for the proposed Porter Padmount located in Bleckley County, Georgia (Figures 1 and 2).

Bleckley County, GA 2022
14694 Whitacre, Stacey R. Phase I Cultural Resources Survey of the Swing Bridge Substation

Introduction

Telfair County, GA 2021
Displaying 11 - 16 of 16