5381
|
Joseph, Joseph W., Hamby, Theresa M.
|
Addendum to Phase I Survey of the I-95/CR 138 Horse Stamp Church Road Interchange
|
No existing or eligible National Register resources were located within the project's area of potential environmental effect.
|
Washington
|
2002
|
5404
|
Joseph, Joseph W., Hamby, Theresa M.
|
Phase I Archaeological Survey of the Oak Road Realignment, Gwinnett County
|
On June 21, 1993, New South Associates conducted a Phase I archeological survey of the proposed Oak Road realignment project for Post, Buckley, Schuh and Jernigan. A pedestrian survey identified a small prehistoric site within the proposed project corridor.
|
Chattooga
|
1995
|
5543
|
Mauldin, Heather, Joseph, Joseph W.
|
Phase I Archaeological Survey of the Proposed Improvements to SR 20, Gwinnett and Walton Counties
|
No existing or eligible National Register archaeological resources were located within the project's area of potential environmental effect.
|
DeKalb
|
1997
|
5544
|
Joseph, Joseph W., Hamby, Theresa M.
|
Phase I Archaeological Survey of the Northern and Sounthern Links of the Northmont-Commerce Connector, Gwinnett County
|
New South Associates conducted a Phase I archaeological survey of the proposed Northmont-Commerce Connector north and south links on May 28, 1998. The northern link is approximately 1,000 feet long while the southern link is 600 feet in length.
|
DeKalb
|
1990
|
5549
|
Joseph, Joseph W., Hamby, Theresa M.
|
Phase I Archaeological Survey of the Sugarloaf parkway at I-85 and various Interchanges and Improvements to I-85, Gwinnett County
|
New South Associates conducted a Phase I archeological survey of the roposed Sugarloaf Parkway at 1-85 and various interchanges and improvements to 1-85 from October 21 through October 26, 1992.
|
DeKalb
|
1997
|
5912
|
Joseph, Joseph W.
|
Addendum to the Survey of the Lithonia Industrial Boulevard Extension, Dekalb County
|
This project was conducted in advance of extending Lithonia Industrial Boulevard, on new alignment, from a newly constructed interchange at Interstate 20 (1-20) to Evans Mill Road.
|
DeKalb
|
2010
|
6073
|
Joseph, Joseph W.
|
Phase I Archaeological Survey of South LaGrange Loop
|
A Phase I archaeological survey was conducted in response to proposed changes to the South LaGrange Loop in Troup County, GA. The project entails the addition of a short corridor linking the main road to a property to the west.
|
Coffee
|
2010
|
6213
|
Smith, Greg C., Joseph, Joseph W.
|
Phase 1 Archaeological Survey for Bridge Replacement at CR 169/Stagecoach Rd. at Barnett's Creek
|
The project will replace the narrow and structurally deficient bridge on CR 169/Stagecoach Road over Barnett's Creek with a new reinforced concrete bridge. The project is located in Grady County, approximately 9.4 miles Northeast of Cairo, Georgia, in the 17th Land District, Land Lot No.
|
McIntosh
|
2009
|
6216
|
Smith, Greg C., Joseph, Joseph W.
|
Phase I Archaeological Survey for SR 35lUS 319 Intersection Improvements
|
The project will add a signal and restripe the existing pavement on SR35/US319 at the SR 35 Connector (US 84 11 Bypass), where no signal currently exists. The existing and proposed typical sections include 2-12' lanes in each a direction, a 12' RT turn lane, and a 26' paved median.
|
Richmond
|
2009
|
6337
|
Joseph, Joseph W.
|
Phase I Archaeological Survey of the Intersection of Dallas Highway and Barrett Parkway, Cobb County
|
The project consists of proposed improvements to the intersection of Dallas Highway (SR120) and Ernest Barrett Parkway. A right turn lane would be added to Barrett Parkway southbound.
|
Fulton
|
1979
|