11322
|
Bowen, William R.
|
Archaeological Assessment of Project BRSLB-2153(2), Morgan County
|
Project begins approximately 200 ft south of stream and ends approximately 200 ft north of stream. New structure is A DLB=DLB 8’ x 5’ concrete bridge culvert skewed 75 degrees lt. An 8- ft x 20 ft easement will be required left and right at the stream. No detour will be constructed.
|
Morgan
|
1985
|
11327
|
Bowen, William R.
|
Archaeological Survey of Arkwright Road Extension, RS-0940(1), Bibb County
|
Archaeological Survey of Arkwright Road Extension, RS-0940(1), Bibb County.
|
Bibb
|
1979
|
11328
|
Bowen, William R.
|
Archaeology Assessment of Project FR-004-3(33), Mcduffie County
|
In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project FR-004-3(33), McDuffie County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRH
|
McDuffie
|
1988
|
11334
|
Bowen, William R.
|
Archaeological Assessment of Project I-185-1(88), Muscogee County
|
In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project I-185-1(88), Muscogee County, has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRH
|
Muscogee
|
1982
|
11335
|
Bowen, William R.
|
Archaeological Assessment of Project F-038-1(20), Appling County
|
In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project F-038-1(20), Appling Co., has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRHP).
|
Appling
|
1983
|
11342
|
Bowen, William R.
|
Archaeological Assessment of Project TSAP 27(75), Appling County
|
In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project TSAP 27(75), Appling County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRHP)
|
Appling
|
1982
|
11359
|
Bowen, William R.
|
Archaeological Assessment of Project BRSLB-0905(1), Lincoln County
|
Existing structure is a 23 .8 ft. x 51 f~. Timber, steel and Concrete Bridge. Existing right of way 40 ft.lt and 40 ft. Right. Total = 80 ft. Project begins 300 ft. South of stream and ends 300 ft. north of stream. New structure will be a 30 ft. x 50 ft. Concrete bridge.
|
Lincoln
|
1986
|
11369
|
Bowen, William R.
|
Bridge Review Sheet: BRZLB-211(5), Morgan County
|
This is a bridge project, BRZLB-211(5), in Morgan County. The existing structure is 37 feet long by 13 feet wide. It is on County Road 79 and is over Holgers Creek. It is a concrete deck bridge with steel I-beams and rock end bents. There is no existing ROW.
|
Morgan
|
1985
|
11370
|
Bowen, William R.
|
Bridge Review Sheet: BRZLB-211(4), Morgan County
|
This is a bridge project, BRZLB-211(4), in Morgan County. The existing structure is a 41 feet long by 24 feet wide concrete deck bridge with steel I-beams and concrete end bents.
|
Morgan
|
1985
|
11371
|
Bowen, William R.
|
Bridge Review Sheet: BRZLB-215(2), Muscogee County
|
This is a bridge project, BRZLB-215(2), in Muscogee County. The bridge is on CR 1080/ Elgin Drive in Columbus and is crosses Weracoba Creek. The existing structure is 20 feet long by 46 feet wide and the proposed project will be a double 10 foot by 6 foot bridge.
|
Muscogee
|
1985
|