Back to top

Hinson, Lindsey

Report Number Author(s) Title Abstract Summary County Year
9933 Hinson, Lindsey Addendum Phase I Archaeological Survey for the Proposed Westside Truck Route Waynesboro, Burke County, Georgia

Edwards-Pitman, Incorporated (EP) completed an addendum Phase I archaeological survey for the proposed westside truck route in Burke County, Georgia (TIA PI No. 0011372, TIA Project No. RC07-000009, SAS-2018-00130, and HP-181213-003).

Burke County, GA 2021
14034 Chieffo, Anthony, Hinson, Lindsey Phase I Terrestrial and Underwater Archaeological Surveys for the Proposed Improvements to SR 26/US 80, Chatham County, Georgia

Edwards-Pitman Environmental, Inc. (EPEI) conducted a phase I archaeological survey for the proposed improvements to state route (SR) 26/United States (US) 80 project (Georgia Department of Transportation [GDOT] P.I. No. 0010560, HP No.

Chatham County, GA 2019
14233 Hinson, Lindsey Addendum Phase I Archaeological Survey for the CR 287/ Ebenezer Church Road Over Whitewater Creek Bridge, Fayette County, Georgia

Edwards-Pitman, Inc. (EP) conducted an addendum Phase I archaeological survey in advance of a bridge replacement along County Road (CR) 287/Ebenezer Church Road (Rd) in Fayette County, Georgia (P.I. No. 0008598).

Fayette County, GA 2020
14382 Hinson, Lindsey Addendum Phase I Archaeological Investigation in Advance of the I-285 Westbound Auxiliary Lane Extension AIP Project, Fulton County, Georgia

This project proposes to construct a 12 foot (ft) (3.7 meter [m]) wide auxiliary lane along Interstate (1-)285 westbound between Roswell Road and Riverside Drive extending the 1-285 westbound Roswell Road onramp currently being reconst

Fulton County, GA 2021
14458 Hinson, Lindsey Phase I Archaeological Survey in Advance of the Bridge Replacement on CR 229/Valentine Industrial Parkway over I-85, Jackson County, Georgia

Edwards-Pitman, Inc. (EP) completed a Phase I archaeological survey for the County Road 229 (CR 229)/Valentine Industrial Parkway over Interstate 85 (I-85) bridge replacement project in Jackson County, Georgia (PI No. 0016523 and HP No. 210428-001).

Jackson County, GA 2021
14466 Hinson, Lindsey, Bright, Kaitlyn, Tarleton, Matthew Phase I Archaeological Survey in Advance of the Culvert Replacement on SR 36 over Big Sandy Creek, Butts County, Georgia

The proposed project would replace the existing culvert on State Route (SR) 36 at Big Sandy Creek. The culvert, Structure ID 035-5055-0, constructed in 1954, consists of three steel plate pipes.

Butts County, GA 2021
14527 Hinson, Lindsey PHASE I ARCHAEOLOGICAL SURVEY AND PHASE II TESTING OF 9DU380 FOR THE SR 133 AND LOVERS LANE ROAD INTERSECTION, DOUGHERTY COUNTY, GEORGIA

Dougherty County, GA 2021
14535 Hinson, Lindsey Phase I Archaeological Survey in Advance of a Proposed Roundabout at the Intersection of SR 22/US Highway 80/Eisenhower Parkway and CR 740/Fulton Mill Road, Macon-Bibb County, Georgia

Edwards-Pitman Environmental, Inc.

Bibb County, GA 2019
14544 Hinson, Lindsey Phase I Archaeological Survey for the I-285 Eastside Bridge Replacements AIP Project on Glenwood Road, Redwing Circle, and Covington Highway, DeKalb County, Georgia

Edwards-Pitman, Inc.

DeKalb County, GA 2020
14553 Hinson, Lindsey Phase I Archaeological Survey in Advance of the I-285/I-20 East Interchange Reconstruction Project, DeKalb County, Georgia

Edwards-Pitman, Inc. (EP) conducted a Phase I archaeological survey in advance of the Interstate (I-)285/I-20 East Interchange Reconstruction Project in DeKalb County, Georgia (Georgia Department of Transportation [GDOT] PI No. 0013915).

DeKalb County, GA 2019
Displaying 1 - 10 of 14