Back to top

Archaeological Assessment of Project PR-19(169), Jones County

Report Number
6928
Year of Publication
1977
Abstract

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, and the Georgia Environmental Policy Act of 1991, project PR-19 (169), Jones County has been surveyed with respect to archaeological resources, especially those on or eligible f o r inclusion in the National Register of Historic Places (NRHP). The purpose of the survey was to locate, identify and evaluate the significance of any archaeological resources within the proposed project's area of potential environmental effect. Project PR-19(169) involves the leveling and resurfacing of Green Settlement Road / CR 19 / CR 290 in Jones county. Also included in the proposed project would be the reconstruction of the existing shoulders. The project would begin at the intersection of SR 11 and would end at the intersection of CR 40. The existing right-of-way is approximately 24.4 m (80 ft). No additional right-of-way would be required for the completion of the proposed project. An archaeological survey consistent with the proposed right-of-way was conducted for the entire length of project corridor. An archaeological survey (Level I) was conducted in accordance with "GDOT / FHWA Cultural Resource Survey Guidelines" developed by the GDOT Staff Archaeologists in consultation with DNR Historic Preservation Section Staff and concurred in by the Federal Highway Administration and State Historic Preservation Officer. These guidelines provide general survey boundaries and methodological approaches to archaeological surveys based on the type / scope of proposed highway projects and are followed during the initial identification of archaeological resources. No existing or eligible National Register archaeological resources were located within the project's area of potential environmental effect. It is concluded, therefore, that the project will have no effect upon archaeological resources on or eligible for inclusion in the NRHP provided that the project conforms to that described above.