Abstract

The project is located in Eastman, Dodge County, Georgia. The project consists of approximately 0.15 mile of leveling and resurfacing of West Main Street and Main Street, replacing existing curb and gutter and replacing sidewalk with Americans with Disabilities Act (ADA) accessibility where required. Fourteen streetlights along the new sidewalks would also be installed. The existing West Main Street (CS 552) is a two-lane, paved roadway consisting of one 12-foot lane in each direction with urban shoulders. The west side of the street consists of angled parking and sidewalk. The east side of the street consists of curb and gutter with straight-angled parking. Main Street (CS 605) is a one-lane paved city street with urban shoulders and parallel parking and sidewalk on the east side of the street only. West Main Street (CS 552) would remain a two-lane, paved city street with parking on both sides of the street. Existing curb and gutter would be replaced. Existing sidewalk would be removed and replaced. ADA ramps would be constructed at corners and crosswalks would be marked. Main Street (CS 605) would remain a one-lane 12-foot city street. The street would be leveled and resurfaced. Curb and gutter would be constructed on both sides of the street. Existing sidewalk would be removed and replaced. ADA ramps would be constructed at corners and crosswalks would be marked. On-street parking would remain. The existing right-of-way for West Main Street is 60 feet and approximately 40 feet for Main Street. All improvements would be within the existing right-of-way on West Main Street and Main Street.