2044 Reynolds, Michael W. Phase I Archaeologicl Survey of the Proposed Liberty Expressway (US19-SR3)/ Moultrie Road (SR133) Intersection Improvements Corridor Dougherty County, Georgia

From 24 to 28 July 2000, Brockington and Associates, Inc., conducted an intensive archaeological resources survey of the Liberty Expressway (US19-SR3)/Moultrie Road (SR133) intersection in Dougherty County, Georgia.

Dougherty 2000
2107 Reynolds, Michael W. Archaeological Survey of the South Hall Parkway

Brockington and Associates, Inc., conducted an archaeological survey for the proposed South Hall Parkway corridor in Hall County, Georgia on May 15, 2000 (GDOT Project STP-0001-00[97]).

Hall 2000
2142 Reynolds, Michael W. Phase I Archaeological Survey of the Proposed Liberty Expressway/ North Jefferson Street (US 19 [SR 3]/ SR 91) Intersection Improvements Corridor, Dougherty County, Georgia

From July 24 to 28, 2000, Brockington and Associates, Inc., conducted intensive archaeological survey of the Liberty Expressway/North Jefferson Street (US Highway 19 [State Route 3]/State Route 91) intersection in Dougherty County, Georgia.

Dougherty 2001
2144 Reynolds, Michael W. Phase I Archaeological Survey of the Proposed Liberty Expressway/Clark Avenue (US19 [SR 3]/ SR 300) Intersection Improvements Corridor, Dougherty County, Georgia

From July 24 to 28, 2000, Brockington and Associates, Inc., conducted an intensive archaeological resources survey of the Liberty Expressway/Clark Avenue (US Highway 19 [State Route 3]/State Route 300) intersection in Dougherty County, Georgia.

Dougherty 2001
2147 Reynolds, Michael W. Phase I Archaeological Survey of the Proposed Tilly Mill Road Improvement Corridor DeKalb County, Georgia

In March 2001, Brockington and Associates, Inc., conducted Phase I archaeological survey of the proposed intersection improvement corridor for Tilly Mill, North Peachtree and Peeler Roads in DeKalb County, Georgia (Project STP-9269 (1); P.I. # 753045; HP#010328-007 ).

DeKalb 2001
2153 Gardner, Jeffrey W., Reynolds, Michael W. Phase I Archaeological Survey of the Proposed Briarwood Road Bridge Replacement, DeKalb County, Georgia

In March 2001, Brockington and Associates, Inc., conducted Phase I archaeological survey of the proposed Briarwood Road Bridge Replacement in DeKalb County, Georgia (Project No. BRZLB-89[6]; P.I. No. 771170; HP #010404-008).

DeKalb 2001
2539 Butler, C. Scott, Reynolds, Michael W. Archaeological Resources Survey of the Abercorn Street (SR 204) Widening Corridor, Chatham County, Georgia

From 23 to 24 July 2001, Brockington and Associates, Inc., conducted an intensive archaeological survey of the Abercorn Street (SR 204) widening corridor in Chatham County, Georgia (Project NHS-002-00 [922], P.I. No.

Chatham 2003
4120 Reynolds, Michael W. Archaeological Resources Survey for the Gunn Road Substation, Peach County, Georgia

An intensive archaeological resources survey was carried out for the Georgia Transmission Corporation's proposed Gunn Road Substation in Peach County, Georgia.

Peach 2000
4421 Reynolds, Michael W., Whitley, Thomas G. Phase I Achaeological Survey Ponce de Leon Avenue/Scott Boulevard Improvements Corridor and Phase I and Phase II Testing Deepdene Park Pedestrian Trail Corridor

In July and August of 2007, Brockington and Associates, Inc., conducted a Phase I Cultural Resources Survey of the SR 8, Ponce de Leon Avenue/Scott Boulevard sidewalks and Deepdene trail improvement corridor in DeKalb County, Georgia, GDOT Project STPOO-000200 (404).

DeKalb 2008
4555 Reynolds, Michael W., Whitley, Thomas G. Archaeological Survey of the SR 156 (Red Bud Road)/College Street (CS 782) Intersection Addendum

Changes to the project include changes to the amount of right-of-way (ROW) required for the project and changes to the proposed culvert carrying Stream I under College Street/CS 782.