Report Number Author(s) Title Abstract Summary County Year
8137 Reynolds, Michael W. Reevaluation-2 of the US 23/Clairmont Road Sidewalks Improvements Project

Originally, the subject project was to construct sidewalks along US 23/Ciairmont Road in DeKalb, County.

Fulton 2014
8230 Reynolds, Michael W. Archaeological Reevaluation: Ponce de Leon Ave./Scott Blvd. Sidewalk Improvements

The proposed project would consist of sidewalk improvements to SR 8, Ponce de Leon Avenue, in DeKalb, County.

Gwinnett 2013
8711 Reynolds, Michael W. Archaeological Survey of the Uptown Pine Lake Phase II Improvements Corridor

P.I. 0008121 has been designed to match the typical section of this segment of Rockbridge Road (Allgood Road to Rowland Road) with the typical section of the larger widening project, GDOT P.I. 0008401 (SR 10 / Memorial Drive to Stone-Mountain / Lithonia Road).

Fulton 2015
9010 Reynolds, Michael W. Archaeological Survey for the Proposed Bridge Replacement on Crescent Avenue Over Silver Creek, Floyd County, Georgia

The proposed project would consist the construction of a new bridge adjacent to the existing Crescent Avenue bridge over Silver Creek.

Paulding 2002
9011 Reynolds, Michael W. Archaeological Survey for the Proposed Repairs to Three Heart of Georgia Railroad Bridges Crisp and Sumter Counties, Georgia (Bridge 2 at Cherokee Creek).

The proposed project consists of repairs to the Heart of Georgia Railroad corridor between Preston Georgia and Cordele Georgia, a distance of approximately 50 miles (80.4 kilometers) (see attached project location map). The project corridor is located in Webster, Sumter, and Crisp counties.

Bartow 2011
9040 Reynolds, Michael W. Archaeological Survey for Proposed Repairs to Three Heart of Georgia Railroad Bridges, Crisp and Sumter Counties, Georgia (Bridge 3 at Gum Creek, Crisp County)

The proposed project consists of repairs to the Heart of Georgia Railroad corridor between Preston Georgia and Cordele Georgia, a distance of approximately 50 miles (80.4 kilometers) (see attached project location map). The project corridor is located in Webster, Sumter, and Crisp counties.

Pierce 2010
9041 Reynolds, Michael W. Archaeological Survey for Proposed Repairs to Three Heart of Georgia Railroad Bridges, Crisp and Sumter Counties, Georgia (Bridge 1 at Muckalee Creek, Sumter County)

The proposed project consists of repairs to the Heart of Georgia Railroad corridor between Preston Georgia and Cordele Georgia, a distance of approximately 50 miles (80.4 kilometers) (see attached project location map). The project corridor is located in Webster, Sumter, and Crisp counties.

Henry 1999
9131 Franz, David M., Reynolds, Michael W. Phase I Cultural Resources Survey of the Owl Creek Mitigation Bank Site

From October 19 to October 23, 2015, Brockington and Associates, Inc. (Brockington) of Norcross, Georgia, conducted a Phase I cultural resources survey of the 109.52-acre (44.32-hectare) Owl Creek Mitigation Bank Site in Towns County, Georgia.

Cobb 2015
9144 Reynolds, Michael W. Sandy Springs - SR 9 Sidewalks Improvements Project

The project consists of a 0.7 mile (1.1 km) section of Roswell Road (State Route 9) between Long Island Drive and Meadowbrook Drive NE.

Stewart 2015
9146 Reynolds, Michael W. Addendum: Snapfinger Road at Post Office Drive and Beach Valley Lane

Addition of permanent easements to flatten slopes, for additional drainage, for the removal of a recently constructed wall and construction of slopes near Post Office Drive. The original survey corridor consisted of Snapfinger Rd. extending from Flat Shoals Parkway to Wesley Chapel Rd.

Cobb 2004
Displaying 31 - 40 of 55