Back to top

Franz, David M.

Report Number Author(s) Title Abstract Summary County Year
3043 Franz, David M., Whitley, Thomas G. Clairmont Road Sidewalk Improvements-Phase I

The proposed project would consist of sidewalk improvements to Clairmont Road in DeKalb, County.

DeKalb County, GA 2008
4589 Franz, David M., Rabbysmith, Steven Phase I Cultural Resources Survey of the Proposed Project ExCEL Colonial Petroleum Pipeline Corridor

Colonial Pipeline Company (Colonial) is an interstate carrier of refined petroleum products. The Colonial system delivers about 100 million gallons of gasoline, kerosene, home heating oil, diesel fuel, and jet fuel daily to shipper terminals in 13 states through a 5,500-mile pipeline system.

Haralson County, GA 2008
5375 Franz, David M. Chickamauga Sidewalk Improvements

No existing or eligible National Register archaeological resources were located within the project's area of potential environmental effect.

Washington County, GA 1992
6719 Butler, C. Scott, Franz, David M. Archaeological Data Recovery Investigations at 9CB567: An Eighteenth and Nineteenth Centruy Plantation Site in the Riverwood Plantation Development Tract

Site 9CB567, the Germany House Plantation, is a late eighteenth to early twentieth-century occupation site with a small prehistoric component. Site 9CB567 is located roughly 0.7 miles southwest of the Savannah River, in the uplands west of Germain Island in Columbia County, Georgia.

Forsyth County, GA 1995
6720 Franz, David M. Intensive Archaeological resources Survey for the branch-Wadley #1 and #2 230 KV Transmission Line Corridor

A Phase I intensive archaeological resources survey was conducted for the Branch-Wadley #l and #2 230 kV Transmission Line Corridor in Putnam, Hancock, Baldwin, Washington, and Jefferson counties, Georgia.

Forsyth County, GA 1989
6721 Franz, David M. Intensive Archaeological Resources Survey for the Branch-Bonaire #1 and #2 230 kV Transmission Line Corridor

A Phase I intensive archaeological resources survey was conducted for the Branch-Bonaire #l and #2 230 kV Transmission Line Corridor in Putnam, Baldwin, Jones, Twiggs and Houston counties, Georgia.

Forsyth County, GA 1991
6722 Franz, David M. Intensive Archaeological Resources Survey for the Proposed Burnt Church-Tradeport Industrial Park 115kV Transmission Line

A Phase I intensive archaeological resources survey was conducted for the proposed Burnt Church-Tradeport Industrial Park 115kV Transmission Line in Liberty and Bryan counties, Georgia.

Forsyth County, GA 1986
6723 Franz, David M. Intensive Archaeological Resources Survey for the Proposed McConnell Road-Huntsville Electric Transmission Line

A Phase I Intensive Archaeological Resources Survey was conducted for the proposed McConnell-Huntsville Electric transmission line in Paulding and Cobb Counties, Georgia.

Gwinnett County, GA 1986
6773 Franz, David M. Phase I Archaeological Survey of the Atwater Substation, Upson County, Georgia

None Present.

Clayton County, GA 1997
7079 Franz, David M. Phase I Archaeological Survey of the Margin Bay Mitigation Bank, Bryan County, Georgia

During December 2007, Brockington and Associates completed a background literature review and field investigations for a Phase I cultural resources survey within and near the Migration Bay Mitigation Bank project area, Bryan County, Georgia in conjunction with a proposed wetland restoration of t

Cherokee County, GA 2006
Displaying 1 - 10 of 44