Report Number Author(s) Title Abstract Summary County Year
7089 Franz, David M. Intensive Shovel Testing at Site 9FO218, Fulton County, Georgia

On August 10-11, Brockington and Associates completed a background literature review and field investigations for an intensive shovel testing survey for the proposed realignment of the Norcross-Suwannee 230 kV transmission line further south of the road and onto National Park Service (NPS) prope

Fulton County, GA 2004
7096 Franz, David M. Phase I Archaeological Survey of the Berzelia Substation Expansion, Columbia County, Georgia

On July 14, 2008, Brockington and Associates completed a background literature review and field investigations for a Phase I cultural resources survey for the proposed 4.6 ac expansion of the Berzelia Substation site in Columbia County, Georgia.

Spalding County, GA 2011
7097 Franz, David M. Additional Phase I Archaeological Survey of the Berzelia Substation Expansion (Horeman Tract II), Columbia County, Georgia

During the week of February 23, 2009, Brockington and Associates completed a background literature review and field investigations for a Phase I cultural resources survey for the Ronnie N.

Cherokee County, GA 2005
7098 Franz, David M. Phase I Archaeological Survey of the Fort Valley Substation, Peach County, Georgia

The week of May 19, 2008, Brockington and Associates completed a background literature review and field investigations for a Phase I cultural resources survey for the proposed new Fort Valley Substation site in Peach County, Georgia.

Chatham County, GA 2001
7104 Franz, David M. Intensive Archaeological Resources Survey for the North Americus - Vienna (Pitts) 115kV Transmission Line Corridor, Sumter and Dooly Counties, Georgia

A Phase I intensive archaeological resources survey was conducted for the North Americus - Vienna (Pitts) 115kV Transmission Line Corridor in Sumter and Dooly counties, Georgia.

Bryan County, GA 2005
7135 Franz, David M., Whitley, Thomas G. Intensive Archaeological Resources Survey for the Proposed Thomas-Warthen Electric Transmission Line

A Phase I Intensive Archaeological Resources Survey was carried out for the proposed Thomson-Warthen electric transmission line in Washington, Glascock, Warren, and McDuffie Counties, Georgia.

Henry County, GA 2005
7410 Franz, David M. Phase I Archaeological Survey of the Amboy Electrical Substation Expansion, Turner County, Georgia

On December 6-10, 2012, Brockington and Associates completed a background literature review and field investigations for a Phase I archaeological survey for an expansion of the Amboy electrical substation along Georgia Highway 159 in Turner County, near Ashburn (Figures 1-4).

Richmond County, GA 1998
7524 Franz, David M. Phase I Archaeological Survey of the Tammy Lane Electrical Substation, Terrell County, Georgia

On February 17 2014, Brockington and Associates completed a background literature review and field investigations for a Phase I archaeological survey for the proposed Tammy Lane electrical substation southwest of the intersection of Tammy Lane and Tammy Lane Road, near Dawson (Figures 1-4).

Cherokee County, GA 2011
7526 Franz, David M. Phase I Archaeological Survey of the Bramlett Shoals Electrical Substation and Transmission Line, Gwinnett County, Georgia

On February 17 2014, Brockington and Associates completed a background literature review and field investigations for a Phase I archaeological survey for the proposed Bramlett Shoals electrical substation and associated transmission line located along Grayson New Hope Road in Lawrenceville, Gwin

Oglethorpe County, GA 2011
7591 Franz, David M., Bragg, Rachel Phase I Cultural Resources Survey of the 93-Acre Buffington Road Site

From January 3 to January 6, 2014, Brockington and Associates, Inc. (Brockington; Norcross, Georgia), conducted a Phase I cultural resources survey of the 93-acre (37.6-hectare) Buffington Road Site in Union City, Georgia.

Henry County, GA 2002
Displaying 11 - 20 of 44