Back to top

Whitley, Thomas G.

Report Number Author(s) Title Abstract Summary County Year
1221 Whitley, Thomas G. Phase III Archaeological Data Recovery at Site 9SU10 and 9SH23, Sumter and Schley Counties, Georgia

In 2003, the Georgia Department of Transportation (GDOT), Office of Environment and Location, contracted with Brockington and Associates, Inc. (Brockington) to conduct Phase III Data Recovery at two archaeological sites in Sumter and Schley Counties.

Schley 2007
1244 Whitley, Thomas G. Archaeological Resources Survey of the Proposed Camilla Substation

An intensive cultural resources survey was carried out for the Georgia Transmission Corporation's proposed Camilla Substation in Mitchell County, Georgia. The total area surveyed included a roughly 1.2 hectare (3 acre) area of impact for the substation construction.

Mitchell 1997
1347 Whitley, Thomas G. A Cultural Resources Survey for the Proposed South Waco Substation and Access Road in Haralson County, Georgia

An intensive cultural resources survey was carried out for the Oglethorpe Power Corporation's proposed South Waco substation and access road.

Haralson 1995
1352 Whitley, Thomas G. A Cultural Resources Survey for the Proposed North Jackson Substation, Access Road and Transmission Line in Jackson County, Georgia

An intensive cultural resources survey was carried out for the Oglethorpe Power Corporation's proposed North Jackson substation, access road and transmission line.

Jackson 1995
1403 Whitley, Thomas G. A Cultural Resources Survey for the Proposed Sleepy Hollow 115/12kv Substation

An intensive cultural resources survey was carried out for the Oglethorpe Power Corporation's proposed Sleepy Hollow substation, in Houston County, Georgia. The total area surveyed included a 350 fit x 500 fit (106 m x 152 m) rectangular area of impact for the substation construction.

Houston 1995
1414 Whitley, Thomas G. A Cultural Resources Survey for the Proposed Offerman Chip Mill Substation and Transmission Line

An intensive cultural resources survey was carried out for the Oglethorpe Power Corporation's proposed Overman Chip Mill Substation and Transmission Line in Pierce County, Georgia.

Pierce 1995
1416 Whitley, Thomas G. An Archaeological Resources Survey for the Proposed Widening of US 441 and Center Bypass in Jackson County, Georgia

An intensive archaeological resources survey was conducted by the Michael Baker Jr., Inc., Cultural Resources Staff(Atlanta Division) in Jackson County, Georgia, along US 441 for a total distance of 22.7 km (14.2 miles).

Jackson 1995
1419 Whitley, Thomas G. A Cultural Resources Survey for the Proposed North Lakeland 115kv Transmission Line, Lanier County, Georgia

An intensive cultural resources survey was carried out for the Oglethorpe Power Corporation's proposed North Lakeland 11 5kV Transmission Line in Lanier County, Georgia.

Lanier 1996
1430 Whitley, Thomas G. A Cultural Resources Survey for the Proposed Collins Chip Mill Substation and Transmission Line

An intensive cultural resources survey was conducted by the Atlanta Branch of the Cultural Resources Section of Michael Baker Jr., Inc., on December 15th, 1995, for Oglethorpe Power Corporation in Tattnall County, Georgia. The survey encompassed 0.94 hectares (2.35 ac).

Tattnall 1995
1464 Whitley, Thomas G. Cultural Resources Survey and Testing for the Proposed Hawkinsville Golf Course in Pulaski County, Georgia

An intensive cultural resources survey was carried out for the proposed Hawkinsville Golf Course, in Pulaski County, Georgia.

Pulaski 1996
Displaying 1 - 10 of 116