Report Number Author(s) Title Abstract Summary County Year
6858 Hicks, Lacey M., Whitley, Thomas G. Cultural Resources Survey for the Proposed Lake Sinclair Water Treatment Facility, Putnam County, Georgia

An intensive cultural resources survey was carried out for the proposed Lake Sinclair Water Treatment Facility in Putnam County, Georgia. The project was carried out in compliance with Section 106 of the National Historic Preservation Act by personnel qualified under 36 CFR Part 61.

Hall 2000
7128 Powis, Terry G., Whitley, Thomas G. Archaeological Resources Survey For the Pless Road Substation White County, Georgia

On 27 and 31 January 2003, an intensive archaeological resources survey was conducted by Brockington and Associates, Inc., for the proposed Pless Road Substation in White County, Georgia.

Spalding 2004
7134 Shah, Sudha A., Whitley, Thomas G. Phase III Archaeological Data Recovery at Site 9FN341

From July 17 to August 25, 2006, and from March 19 to 23, 2007, Brockington and Associates, Inc. (Brockington), on behalf of Blue Ridge Golf and River Holdings, LLC, carried out Phase III archaeological data recovery field investigations at Site 9FN341, Fannin County, Georgia (Figure 1.1).

DeKalb 2004
7135 Franz, David M., Whitley, Thomas G. Intensive Archaeological Resources Survey for the Proposed Thomas-Warthen Electric Transmission Line

A Phase I Intensive Archaeological Resources Survey was carried out for the proposed Thomson-Warthen electric transmission line in Washington, Glascock, Warren, and McDuffie Counties, Georgia.

Henry 2005
7136 Whitley, Thomas G., Olvey, Whitney Archaeological Resources Survey of the Southpark Project Tract, Fulton County, Georgia

Under contract with M.D. Hodges, Inc., Brockington and Associates, Inc., conducted an intensive archaeological resources survey (Phase I) of the Southpark Tract in Fulton County, Georgia.

Habersham 2002
7138 Will, Bryan P., Whitley, Thomas G. Archaeological Resources Survey for the Proposed Martin's Landing Transmission Line, Gwinnett/Fulton Counties, Georgia

Brockington and Associates, Inc., conducted and archaeological transmission line survey for Jordan, Jones and Goulding, Inc. on 8-9 January 2002 along Holcomb Bridge and Nesbit Ferry Road in Gwinnett/Fulton counties.

Gwinnett 2005
7139 Atz, Leiellen M., Whitley, Thomas G. Archaeological Resources Survey for the Proposed Scrubby Bluff Transmission Line and Substation, Camden County, Georgia

From 23 to 24 October 2001 , Brockington and Associates, Inc. conducted Phase I archaeological survey of the proposed Scrubby Bluff Transmission Line and Substation in Camden County, Georgia.

Gwinnett 2002
7140 Atz, Leiellen M., Whitley, Thomas G. Archaeological Resources Survey for the Proposed Dover Transmission Line and Substation, Screven County, Georgia

From 25 to 26 October 2001 , Brockington and Associates, Inc. conducted Phase I archaeological survey of the proposed Dover Transmission Line and Substation in Screven County, Georgia.

Fulton 2004
7144 Atz, Leiellen M., Whitley, Thomas G. Archaeological resources Survey for the Proposed Brookman Substation, Glynn County, Georgia

On 22 October 2001 , Brockington and Associates, Inc. conducted Phase I archaeological survey of the approximately 3 acre Brookman Substation in Glynn County, Georgia.

Whitfield 2004
7148 Will, Bryan P., Whitley, Thomas G. Archaeological Resources Survey for the Proposed Dresden Substation, Coweta County, Georgia

Brockington and Associates, Inc., conducted an archaeological survey for the proposed Dresden Substation Project in Coweta County, Georgia, on 19, 20, and 21 of December 2001 for Jordan Jones and Goulding, Inc.

Stephens 2004
Displaying 81 - 90 of 116