Back to top

Atz, Leiellen M.

Report Number Author(s) Title Abstract Summary County Year
2015 Gardner, Jeffrey W., Atz, Leiellen M. Archaeological Survey for Proposed Reconstruction of the Interstate 16/ Interstate 75 Interchange, Bibb County, Georgia

From 21 February to 8 March 2000, Brockington and Associates, Inc., conducted Phase I intensive archaeological survey of the proposed I-16/1-75 interchange reconstruction project in Bibb County, Georgia.

Bibb County, GA 2000
2082 Atz, Leiellen M., Jordan, William R. Phase II Evaluation of Sites 9CK1057 and 9CK1063 McGraw Ford Substation Tract Cherokee County, Georgia

From 14 August 2000 to 18 August 2000 Brockington and Associates, Inc., conducted Phase II archaeological testing of 9CK1057 and 9CK1063 in Cherokee County, Georgia, for Georgia Power Company.

Cherokee County, GA 2001
2095 Atz, Leiellen M. Archaeological Survey for Proposed Improvements of Dietz Road

From 14 to 16 February 2001, Brockington and Associates, Inc., conducted Phase I archaeological survey of the proposed improvement corridor of Dietz Road, Catoosa County, Georgia.

Catoosa County, GA 2001
2212 Atz, Leiellen M. Archaeological Resources Survey of the Proposed Hickory Level Substation, Carroll County, Georgia

Under contract with Jordan, Jones & Goulding, Inc., Brockington and Associates, Inc. performed an intensive archaeological resources survey (Phase I) within the Georgia Transmission Corporation's proposed Hickory Level Substation project tract.

Carroll County, GA 2001
2533 Atz, Leiellen M. Phase I Cultural Resources Survey of Hales Landing, Lake Seminole, Decatur County, Georgia

From 11 to 15 March 2002, Brockington and Associates, Inc., conducted intensive Phase I cultural resources survey of the 93 acres (37.6 ha) Area of Potential Effect (APE) for a new campground development at Hales Landing, Lake Seminole, Decatur County, Georgia.

Decatur County, GA 2002
2571 Fuller, Elizabeth L., Atz, Leiellen M. Phase I Archaeological Survey of Riverview Road at Northside Drive, Fulton County, Georgia

On 16 July 2002, Brockington and Associates, Inc., performed an intensive archaeological survey (Phase I) along the southwest of Riverview Road at the intersection with Northside Drive.

Fulton County, GA 2002
2653 Atz, Leiellen M. Phase I Archaeological Survey of Flat Shoals Road/I-285 Interchange Improvements DeKalb County, Georgia

From 18 to 20 January 2003, Brockington and Associates, Inc., conducted Phase I archaeological survey along Flat Shoals Road and 1-285 in advance of proposed reconstruction and rehabilitation of the interchange.

DeKalb County, GA 2004
3502 Atz, Leiellen M., Whitley, Thomas G. Phase II Archaeological Testing of Site 9DU154 Dougherty County, Georgia

From 15 to 19 August 2005, Brockington and Associates, Inc. conducted Phase II archaeological testing of site 9DU154 in Albany, Dougherty County, Georgia. This investigation was conducted under contract with the U.S. Army Corps of Engineers, Mobile District (USACE).

Dougherty County, GA 2005
3789 Atz, Leiellen M. Phase I Archaeological Survey of the Proposed Big Creek Greenway Extension, Fulton County, Georgia

This project examined a proposed 0.75-mile greenway trail extension to the existing Big Creek Greenway. The extension will extend the Big Creek Greenway from the northern end of the existing Greenway at Webb Bridge Road to Marconi Drive.

Fulton County, GA 2006
3827 Atz, Leiellen M. Phase I Archaeological Survey of the Proposed State Road 96 Improvements, Peach and Houston Counties, Georgia

From 7 to 11 August 2006, Brockington and Associates, Inc., conducted Phase I archaeological survey along State Road 96, Peach and Houston Counties, GA, in advance of proposed road improvements.

Houston County, GA 2006
Displaying 1 - 10 of 21