Back to top

Fuller, Elizabeth L.

Report Number Author(s) Title Abstract Summary County Year
2545 Fuller, Elizabeth L., Gardner, Jeffrey W. Phase I Archaeological Resources Survey of the Proposed Replacement of the State Route 172 Bridge Over Coldwater Creek, Hart County, Georgia

On 20 August 2002, Brockington and Associates, Inc., performed intensive archaeological resources survey (Phase I) within the approximately 656 meter (2,150 ft) project corridor for the proposed bridge replacement over Coldwater Creek along State Route (SR) 172 in Hart County, Georgia.

Hart 2002
2571 Fuller, Elizabeth L., Atz, Leiellen M. Phase I Archaeological Survey of Riverview Road at Northside Drive, Fulton County, Georgia

On 16 July 2002, Brockington and Associates, Inc., performed an intensive archaeological survey (Phase I) along the southwest of Riverview Road at the intersection with Northside Drive.

Fulton 2002
6833 Fuller, Elizabeth L. Phase II Historic Resources Survey Archaeological Testing of Site 9FU416 Fulton County, Georgia

From 16 to 19 December 2002, Brockington and Associates, Inc., conducted Phase II archaeological testing of site 9FU416 in Fulton County, Georgia.

Elbert 1980
6849 Fuller, Elizabeth L., Gardner, Jeffrey W. Phase I Cultural Resources Survey of the Proposed Runway Extension at the Habersham Airport Habersham County, Georgia

Between 29 July and 14 September 2002, Brockington and Associates, Inc., conducted a Phase I cultural resources survey of three tracts totaling 60 acres, adjacent to Habersham County Airport in Cornelia, Georgia.

Wilkes 1976
7126 Fuller, Elizabeth L. Phase I Cultural Resources Survey of the Proposed Imerys YWG-1 and YWG-104 Mining Areas, Clascock and Warren Counties, Georgia

From 28 October to 1 November 2002, Brockington and Associates, Inc., conducted intensive cultural resources survey within the proposed YWG-1 04 and YWG-1 mining areas of Imerys Clays, Inc.'s Deepstep Lands and Mines Properties.

Spalding 2004
7143 Fuller, Elizabeth L., Gardner, Jeffrey W. Phase I Cultural resources Survey of the Proposed Runway Extension at the Hvaersham Airport Haversham County, Georgia

Between 29 July and 14 September 2002, Brockington and Associates, Inc., conducted a Phase I cultural resources survey of three tracts totaling 60 acres, adjacent to Habersham County Airport in Cornelia, Georgia.

Wayne 2004
7168 Fuller, Elizabeth L., Whitley, Thomas G. Phase I Archaeological Resources Survey of the Proposed Exit 44 to Huntcrest and Huntcrest to Sugarloaf Transmission Lines Gwinnett County, Georgia

An intensive archaeological resources survey was carried out for the proposed Mobley Bridge Substation in Troup County, Georgia. The project was carried out in compliance with Section 106 of the National Historic Preservation Act by personnel qualified under 36 CFR Part 61.

Crawford 1996
Displaying 1 - 7 of 7