Whitley, Thomas G.

Report Number Author(s) Title Abstract Summary County Year
2243 Whitley, Thomas G. Archaeological Resources Survey at Proposed Bridge Replacement in BRST-081-1(21) SR 27 over Pennahatchee Creek Dooly County, Georgia

In October 2001, Brockington and Associates, Inc., conducted an intensive archaeological resources survey at the proposed bridge replacement in Dooly County, Georgia. This investigation was carried out under contract with The LPA Group, Inc. for the Georgia Department of Transportation.

Dooly County, GA 2002
2244 Whitley, Thomas G. Archaeological Resources Survey at Proposed Bridge Replacement in BRST-2088(5) SR 195 over Lime Creek, Sumter County, Georgia

In October 2001, Brockington and Associates, Inc., conducted an intensive archaeological resources survey at the proposed bridge replacement in Sumter County, Georgia. This investigation was carried out under contract with The LPA Group, Inc., for the Georgia Department of Transportation.

Sumter County, GA 2002
2276 Whitley, Thomas G. Archaeological Resources Survey of the South Park Tract, Fulton County, Georgia

Under contract with M.D. Hodges, Inc., Brockington and Associates, Inc., conducted an intensive archaeological resources survey (Phase I) of the Southpark Tract in Fulton County, Georgia.

Fulton County, GA 2001
2287 Hicks, Lacey M., Whitley, Thomas G. Phase I Archaeological Resources Survey for the Proposed Flint River, Smithville, Americus Transmission Line, Lee and Sumpter Counties, Georgia

An intensive archaeological resources survey was carried out for the Georgia Transmission Corporation's proposed Flint River, Smithville, Americus (FSA) Transmission Line in Lee and Sumter counties, Georgia.

Lee County, GA 2000
2290 Whitley, Thomas G. Archaeological Resources Survey at Proposed Bridge Replacements BRST-0649(3) SR137 Over Shoal (Buck) and Gin Creek Marion County, Georgia

In October 2001, Brockington and Associates, Inc., conducted an intensive archaeological resources survey at the proposed bridge replacements in Marion County, Georgia. This investigation was carried out under contract with The LPA Group, Inc., for the Georgia Department of Transportation.

Marion County, GA 2002
2548 Hicks, Lacey M., Whitley, Thomas G. Archaeological Resources Survey for the Proposed Barnesville Transmission Line, Lamar County, Georgia

An intensive archaeological resources survey was carried out for the proposed Barnesville Transmission Line in Lamar County, Georgia. The project was carried out in compliance with Section 106 of the National Historic Preservation Act by personnel qualified under 36 CFR Part 61.

Lamar County, GA 2001
2676 Whitley, Thomas G., Jordan, William R. Archaeological Resources Survey of the Proposed Palmyra-Century Transmission Line, Lee County, Georgia

An intensive archaeological resources survey was carried out for the Georgia Transmission Corporation's proposed Palmyra-Century Transmission Line in Lee County, Georgia.

Lee County, GA 1999
2677 Mozingo, Dea, Whitley, Thomas G. Phase II Archaeological Testing of Site 9LE56 Palmyra-Century Transmission Line

On September 13-15th, 1999, Brockington and Associates, Inc. conducted archaeological testing at Site 9LE56 along the proposed Palmyra-Century Transmission Line corridor in Lee County, Georgia.

Lee County, GA 1999
2759 Huddleston, Connie M., Whitley, Thomas G. The Ford Plantation Project: Archaeological Data Recovery at Silk Hope Plantation (9BN58 &9BN176) Bryan County, Georgia

The Ford Plantation Development includes an area of roughly 720 hectares (1,800 acres) in Bryan County, Georgia, along the south bank of the Ogeechee River.

Bryan County, GA 2003
3043 Franz, David M., Whitley, Thomas G. Clairmont Road Sidewalk Improvements-Phase I

The proposed project would consist of sidewalk improvements to Clairmont Road in DeKalb, County.

DeKalb County, GA 2008
Displaying 31 - 40 of 116