Back to top

SR 172 from Madison County Line to SR 8

Report Number
8877
Year of Publication
2001
Abstract

The proposed project would consist of milling, leveling, resurfacing, wheelchair curb cuts/installation of ADA ramps, shoulder filling, shoulder widening, permanent markings, and raised pavement markings on SR 172 from the Madison County line to SR 8 in Elbert and Hart Counties.

The project length is approximately 17.4 miles. The proposed project would take place within existing right-of-way (ROW); no right-of-way is required.