Culvert Repair: 1-75 northbound (NB) at Clark Creek

Report Number
8985
Year of Publication
1998
County
Abstract

The project proposes to repair undermining of the culvert on 1-75 NB at Clark Creek, which is 1.2 miles east of Exit 277. The work includes repair of a failed wing wall and repair of the failed outlet apron. The work would consist of the removal of the failed apron, construction of the toewall, placement of geotext fabric and placement of riprap. Rip rap would be used to fill the channel to bring the streambed elevated to match the culvert floor. All work will take place within existing ROW.