Back to top

Archaeological Assessment of a District 6 State Aid Resurfacing & Maintenance Project, P.I. No. 0009525

Author(s)
Report Number
9185
Year of Publication
2009
County
Abstract

The proposed project would consist of patching, leveling, resurfacing, striping and earth shoulder building on CS 64209/Charlton Street. It would begin at US 27/SR 1 and end at CS 105009/N. Division Street. The length of the project would be approximately 1.0 mile. The proposed project would be constructed on the existing right-of-way, and no additional right-of-way would be required.