Phase I Archaeological Survey of Proposed Widening of On-Ramps for 1-285/SR 407 at SR 8/Donald Lee Hollowell Parkway Northwest in Fulton County, Georgia

Report Number
9708
Year of Publication
2017
County
Abstract

The proposed project would take place on the northbound and southbound entrance ramps to 1-285 from SR 8/US 278 in the City of Atlanta in Fulton County (Figures 1-3). The existing typical section of each entrance ramp consists of approximately 16 to 24-foot concrete travel lanes. The northbound ramp consists of an urban outside shoulder with closed drainage system and a rural inside shoulder draining to the grassed gore area. The southbound ramp consists of urban outside shoulder with intermittent curb openings to flumes draining to an open ditch and a rural inside shoulder draining to the grassed gore area. The existing ROW varies between 50 and 90 feet from the centerline of the northbound ramp/roadway and between 65 and 150 feet from the centerline of the southbound ramp/roadway. Both ramps are constrained by 1-285 along the inside ramp shoulders.

The project proposes to widen the northbound entrance ramp beginning at approximately station 10+35 and ending at approximately station 25+58. The southbound entrance ramp is proposed to be widened beginning at approximately station 50+38 and ending at approximately station 65+42. The northbound typical section is proposed to consist of two 12-foot travel lanes in one direction with a 12-foot urban outside shoulder with closed drainage and a 6-foot rural inside shoulder (4 foot paved) draining to the grassed gore area/ditch. The southbound typical section is proposed to consist of two 12-foot travel lanes in one direction with a 12-foot rural outside shoulder (10 foot paved) with open ditch and a 6-foot rural inside shoulder (4 foot paved) draining to the grassed gore area/ditch. Dual lane ramp meters will be installed at the existing single lane ramp meter locations.