Back to top

Phase I Archaeological Survey of Proposed Maintenance Improvements along SR 26/SR 67 from Mill Creek to CS 619/North College Street in Bulloch County, Georgia

Report Number
8935
Year of Publication
2006
Abstract

The proposed work consists of milling, resurfacing, loop detectors, rumble strips, striping, raised pavement markers and curb cuts along a 6. 723 mile section of SR 26/SR 67 in Bulloch County (Figure 1). The proposed project would begin at the north end of the Mill Creek bridge approach slab joint to the pavement joint 485 feet east of CS 619/North College Street (MP 10.955 to MP 17.678). The project will take place within existing right-of-way (ROW) which varies throughout. The limits of construction will be five feet from the edge of pavement.