Second Addendum to the Phase I Archaeological Survey Courtland Street Bridge at the CSX Railroad Bridge Replacement, Fulton County, Georgia

Report Number
8978
Year of Publication
2003
County
Abstract

The proposed ROW width would remain 60 feet, with a 0.01-acre required ROW miter in the northwest quadrant of the Courtland Street and Martin Luther King, Jr. Drive intersection. Temporary construction easements up to 40 feet in width would be required along both sides of Courtland Street. The proposed project would require 0.01 acre of ROW and 0.78 acre of temporary easement.