1586 Blackwelder, Jon R., Pietak, Lynn Marie Phase I Archaeological Survey for Clarkston Parking Lot Upgrades, DeKalb County, GA

The proposed project would resurface and renovate an existing paved parking lot located in Clarkston, Georgia. The project area is within existing right-of-way limits and consists of approximately 2.2 acres.

DeKalb County, GA 2008
1764 Blackwelder, Jon R. Phase I Archaeological Survey for the Proposed SR 38/US 84 BU at SR 38/US 84 Intersection Improvement, Decatur County, Georgia

This project consists of improving the intersection on the east end of the Bainbridge Bypass to allow for its connectivity with United States (US) 84 and the re-alignment of US 84 BU. This project may also need a traffic signal and advance warning beacon.

Decatur County, GA 2015
1779 Blackwelder, Jon R., Pietak, Lynn Marie Phase I Survey of Rays Road Sidewald Location, DeKalb County, Georgia

Original Project Description for Rays Road: The proposed project limits are from Memorial Drive to Multi-Use Path (approximately 200 feet south of E. Ponce De Leon Avenue) (1.36 miles).

DeKalb County, GA 2008
4068 Blackwelder, Jon R. Phase I Arch. Survey for the Realignment of SR 56 in Montgomery and Toombs Co., Ga

The proposed project would realign SR 56 to the south starting approximately 500 feet east of Gibbs Bridge Road and tying back to the original alignment approximately 400 feet east of the Toombs County line.

Montgomery County, GA 2007
4070 Blackwelder, Jon R. Ph. 1 Arch. Survey for the Proposed Improvement of SR 53 at SR 3/US 41, Gordon Co., Ga

The proposed project would improve the intersection of SR 53 at SR 3/US 41 in Gordon County, Georgia. The project consists of adding exclusive eastbound right and left turn lanes and a westbound left turn lane from SR 53 onto SR 3/US 41.

Gordon County, GA 2007
4340 Blackwelder, Jon R. Addendum to Arch. Survey for Proposed Improve of SR 53 at SR 3/US 41, Gordon Co., GA

Original: The proposed project would improve the intersection of SR 53 at SR 3/US 41 in Gordon County, Georgia. The project consists of adding exclusive eastbound right and left turn lanes and a westbound left turn lane from SR 53 onto SR 3/US 41.

Gordon County, GA 2008
4392 Blackwelder, Jon R. Archaeological Survey Proposed Bridge Replacement CR 246 at Big Indian Creek, GA

The proposed project would consist of replacing the structurally deficient bridge located on CR 246/Brownwood Road over Big Indian Creek in Morgan County. The proposed 130-foot long bridge would have two 11-foot travel lanes (one in each direction) with 4-foot shoulders on each side.

Morgan County, GA 2008
4393 Blackwelder, Jon R. Archaeological Survey Proposed Bridge Replacement CR 154 at North Sugar Creek, GA

The proposed project would consist of replacing the structurally deficient bridge located on CR 154/Old Buckhead Road over North Sugar Creek, in Morgan County. The proposed 110-foot long bridge would have two 12-foot travel lanes (one in each direction) with 8-foot shoulders on each side.

Morgan County, GA 2008
4455 Blackwelder, Jon R., Jordan, William R. Archaeological Survey of the Proposed Big Indian Creek Bridge Replacement, Morgan County, Georgia

In August 2008, Edwards-Pitman Environmental, Inc. (EPEI) conducted an archaeological survey at the site of the proposed bridge replacement at CR 23/Davis Academy Road over Big Indian Creek in Morgan County, Georgia. The total length of the project is 0.37 miles.

Morgan County, GA 2008
4575 Blackwelder, Jon R., Jordan, William R. Archaeological Survey of the Proposed State Route 44 Improvements Project, Putnam and Greene Counties, Georgia

From January to April 2008, Edwards-Pitman Environmental Inc. (EPEI) conducted an archaeological survey of the proposed State Route (SR) 44 improvements project in Putnam and Greene Counties, Georgia.

Greene County, GA 2009