Back to top

Blackwelder, Jon R.

Report Number Author(s) Title Abstract Summary County Year
8860 Blackwelder, Jon R. Phase I Archaeological Survey for SR 52()/US 82 and County Line Road Intersection Improvements. Dougherty County, Georgia

The proposed project would improve the intersection of SR 520/US 82, South County Line Road, and North County Line Road within the unincorporated Acree community in Dougherty County, Georgia.

Richmond County, GA 2014
8861 Blackwelder, Jon R. Addendum to the Phase I Archaeological Survey for SR 520/US 82 and County Line Road Intersection Improvements, Dougherty County, GA

The proposed project would improve the intersection of SR 520/US 82, South County Line Road, and North County Line Road within the unincorporated Acree community in Dougherty County, Georgia.

Houston County, GA 2004
8864 Blackwelder, Jon R. Second Addendum to Phase I Archaeological Survey of the Spring Street Viaduct Replacement Project, Fulton County, Georgia

Design changes were required to address the cost-to-cure measures requested by the General Services Administration (GSA) and to include intersection improvements at Martin Luther King Jr. Drive and Forsyth Street.

Effingham County, GA 2000
8874 Blackwelder, Jon R. Second Addendum to Phase I Archaeological Survey for the SR 90 over the CSX Railroad Bridge Replacement Project, Macon County, Georgia

The proposed project is a bridge replacement on State Route SR 90 over the CSX Railroad about 8 miles southeast of the City of Ideal.

Glynn County, GA 2002
8896 Blackwelder, Jon R. Phase I Archaeological Survey of SR 135/US 221 over Whitehead Creek, Jeff Davis County, GA

GDOT Project BRST0-0090-01(023) involves the replacement of US 221/SR 135 bridge over Whitehead Creek, located one mile north of the city of Denton in Jeff Davis County, Georgia.

Screven County, GA 2015
8910 Blackwelder, Jon R. Addendum to the Phase I Archaeological Survey of the Proposed Bob Callan Trunk Trail, Phase 2, along Rottenwood Creek, Cobb County, Georgia

The APE for the current addendum includes four segments of easement for construction of a multiuse trail for pedestrians and cyclists as described on a separate sheet.  A 100-foot expanded survey corridor (ESC) was also surveyed as stipulated in the Environmental Procedures Manual.

Catoosa County, GA 2001
8926 Blackwelder, Jon R. Phase I Archaeological Survey of Nine Intersection Upgrades in Brooks and Colquitt Counties, Georgia

The proposed project would upgrade traffic signal equipment at nine locations in Brooks and Colquitt Counties. The proposed project would also improve pedestrian safety to be in compliance with the Americans With Disabilities Act.

Muscogee County, GA 2015
8927 Blackwelder, Jon R. Addendum to the Phase I Archaeological Survey of the Operational Improvements Along SR 400 at CR 9284/Windward Parkway in Fulton County, Georgia

Proposed Improvements: The proposed project would make improvements to the existing intersection of SR 400/US 19 and Windward Parkway in the city of Alpharetta, Fulton County, Georgia.

Pickens County, GA 2013
8938 Blackwelder, Jon R. Addendum to the Phase I Archaeological survey of SR 9Jmprovements from Upper Hembtea Road to Windward Parkway, Fulton County, Georgia

The projects propose to widen and improve SR 9 from Upper Hembree Road to Windward Parkway in Fulton County, Georgia.

Jackson County, GA 1996
8943 Blackwelder, Jon R. Second Addendum to the Archaeological Survey of the Proposed SR 44 Improvements Project, Putnam and Greene Counties, Georgia.

Project P.I. No.

Evans County, GA 2002
Displaying 81 - 90 of 125