Back to top

Blackwelder, Jon R.

Report Number Author(s) Title Abstract Summary County Year
8610 Blackwelder, Jon R. Addendum to the Phase I Archaeological Survey of the Proposed Intersection Report Title: Improvements at State Route 247 and County Route 189/Walker Road, Peach County, Georgia

The proposed intersection improvement project is located at the intersection of State Route (SR) 247 connector and John E. Sullivan Road/Walker Road in Peach County, Georgia.

Clayton 2014
8708 Blackwelder, Jon R. Phase I Archaeological Survey of Intersection Improvements for SR 8/US 78/Bankhead Highway at Report Title: CR 268/Mann Road/Mason Creek Road and CR 808/Post Road, Douglas County, Georgia

The proposed project would improve the intersections of SR 8/US 78/Bankhead Highway with CR 268/Mann Road and Mason Creek Road, CR 250/Conners Road, and CR 808/Post Road and the intersection of Post Road and Mason Creek Road in the Winston community of Douglas County, Georgia.

Hart 2011
8720 Blackwelder, Jon R. Archaeological Evaluation, Emergency Repair of Pryor Road, Fair Drive, and Forrest Park Road, Fulton County, GA, FHWA Emergency Response Program

The Pryor Road bridge (Site 14) over South Fork Tributary is located on Pryor Road south of Ashwood Avenue/Pryor Circle and north of Fair Drive. Flooding caused erosion behind the northwest wingwall of the bridge.

Fulton 2011
8735 Blackwelder, Jon R. Phase I Archaeological Survey of the Proposed SR 104/River Watch Parkway Improvements at Interstate 20 in Richmond County, Georgia

The proposed project would consist of improvements to State Route (SR) 1 04/River Watch Parkway between Quarry Road and Rivershoals Parkway in Augusta, Georgia.

Clayton 2006
8762 Blackwelder, Jon R., Hunt, Michael Phase I Archaeological Survey for the Tucker Streetscape and Pedestrian Enhancement Project, DeKalb County, Georgia

The proposed project would improve and enhance pedestrian facilities in Tucker, Georgia.

Baker 2012
8769 Blackwelder, Jon R. Addendum to the Phase I Archaeological SUIV8y of Jimmy carter Boulevard and Singleton Road Intersection Improvements, Gwinnett County, Georgia

The project consists of approximately 0.32 miles of pedestrian improvements and widening along Jimmy Carter Boulevard (milepost 2.60 to milepost 2.92) and approximately 0.15 miles of pedestrian improvements and widening along Singleton Road and South Norcross-Tucker Road.

Washington 2007
8795 Blackwelder, Jon R. Phase I Archaeological Survey of SR 369 Over the Chattahoochee River Bridge Replacement, Forsyth and Hall Counties, Georgia

The proposed project would consist of replacing the SR 369 Bridge over the Chattahoochee River (Lake Lanier) in Forsyth and Hall Counties, Georgia. The proposed project is located approximately 11.5 miles northeast of the City of Cumming and is approximately 0.78 mile long.

Columbia 2011
8815 Blackwelder, Jon R. Second Addendum to the Phase I Archaeological Survey of the Proposed Lee Road Widening Project, in Douglas County, Georgia

The current addendum addresses the proposed widening of Lee Road from SR 92 to approximately 1,100 feet south of the I-20 interchange (GDOT Project No. MSL00-0004-00(428), P.I. No. 0004428). The first addendum also included GDOT Project No. NHS00-0001-00(917), P.I. No.

Glynn 2010
8831 Blackwelder, Jon R. Second Addendum to Phase I Archaeological Survey of the SR 15/Curry Creek Bridge Corridor in Jackson County, Georgia

The travel lanes were reduced from 12-foot lanes to 11-foot lanes as a result of the Value Engineering study.

Douglas 2013
8854 Blackwelder, Jon R. Third Addendum to Phase I Archaeological Survey for the SR 90 over the CSX Railroad Bridge Replacement Project, Macon County, Georgia

The proposed project is a bridge replacement on State Route (SR) 90 over the CSX Railroad about 8 miles southeast of the City of Ideal.

Walker 2015
Displaying 71 - 80 of 125