Report Number Author(s) Title Abstract Summary County Year
8002 Blackwelder, Jon R. Phase I Archaeological Survey for the Proposed SR 155 Safety Improvement Project, Henry County, Georgia

The proposed project consists of three improvements. The first improvement is an intersection at SR 155 at Hampton-Locust Grove Road/Bill Gardner Parkway.

Hall 2014
8043 Blackwelder, Jon R. Phase I Archaeological Survey for the Proposed Median Crossover Improvements Along SR 3/US 19 from the State Line to County Road (CR) 219 in Thomas County, Georgia

The proposed project is located along SR 3/US 19 from the state line to CR 219 in Thomas County, Georgia. The proposed project would reduce potential fatalities and serious injury collisions by adding 16 feet of lateral offset to the existing left turn lanes at each median opening.

Chatham 2003
8064 Blackwelder, Jon R. Phase I Archaeological Survey of the Proposed Roundabout at the Intersection of SR 52 and SR 115/Copper Mines Road, Lumpkin County, Georgia

The proposed project is located in Lumpkin County at the intersection of State Route (SR) 52 and SR 115/Copper Mines Road. The project consists of intersection reconstruction into a single-lane roundabout. The purpose of the project is to improve operational efficiency and safety.

Fulton 2014
8108 Blackwelder, Jon R. State Route 166/Duncan Memorial Highway and State Route 92/State Route 154 Intersection Improvements, Douglas County

Implementation of the proposed project would result in a finding of No Adverse Effect for archaeological site 9DO2. No right-of-way or easements would be required from within the site’s National Register eligible boundary as all construction work would occur outside this limit.

Monroe 2013
8115 Blackwelder, Jon R. Addendum to Phase I Archaeological Survey of the Proposed Bridge Replacement at SR 203 over Dry Creek, Wayne County, Georgia

The proposed project is located approximately 5.7 miles northwest of Screven in Wayne County, Georgia.

Coweta 2013
8118 Blackwelder, Jon R. Phase I Archaeological Survey of SR 232 Over Walton Branch Creek, Columbia County, Georgia

The proposed project would consist of the replacement of the existing structurally deficient bridge located on SR 232/Columbia Road at Walton Branch.

Bartow 2012
8134 Blackwelder, Jon R. Second Addendum to the Phase I Archaeological Survey of the Proposed Improvement to Gulfstream Road at Robert Miller Road, Chatham County, GA

Located approximately 7 miles northwest of the City of Savannah in Chatham County, Georgia, Project CSMLP-0008-00(276) will involve widening of both Gulfstream Road and Robert B. Miller Road including improvement of the intersection.

Newton 2012
8136 Blackwelder, Jon R. Phase I Archaeological Survey of SR 38/US 221/East Hill Avenue at CR 439/Clay Road and CS 1271/Hollywood Street Intersection Improvements, Lowndes County, Georgia

The proposed project is located approximately 4 miles east of I-75 in Valdosta in Lowndes County, Georgia.

Clayton 2013
8141 Blackwelder, Jon R. Phase I Archaeological Survey of the SR 400 from CR 458/McFarland Road to Big Creek Greenway Northbound Lane Extension, Forsyth County, Georgia

The proposed project would consist of the extension of the third northbound lane along SR 400 for approximately 0.75 mile to Improve the transition from the existing four-lane northbound section that terminates south of McFarland Parkway to the two-lane section that extends northward to the Big C

Rockdale 2013
8153 Blackwelder, Jon R. Phase I Archaeological Survey of the On-Ramp Reconstruction from Abernathy Road to SR 400, Fulton County, Georgia

The proposed project would consist of the reconstruction of the on-ramp from Abernathy Road to SR 400 northbound to add approximately one-quarter mile of pavement.

Cobb 2013
Displaying 51 - 60 of 125