Blackwelder, Jon R.

Report Number Author(s) Title Abstract Summary County Year
4578 Blackwelder, Jon R. Archaeological Survey of the Proposed Little Sugar Creek Bridge Replacement, Morgan County, Georgia

In July 2008, Edwards-Pitman Environmental, Inc. (EPEI) conducted an archaeological survey at the site of the proposed County Road (CR) 133-Little Sugar Creek bridge replacement, Morgan County, Georgia. The total length of the project was 0.32 miles.

Morgan 2009
4624 Blackwelder, Jon R. Addendum to the Phase I Archaeological Survey of the Flat Shoals Road at Covington Bypass Intersection Improvements, Newton County, Georgia

Georgia Department of Transportation (GDOT) P.I. 0012646 is a proposed intersection improvements project at the CR 653/Covington Bypass and CR 181/Flat Shoals Road intersection approximately 1.5 miles southeast of the city of Porterdale in Newton County, Georgia.

Newton 2015
4956 Blackwelder, Jon R., Pietak, Lynn Marie Sixth Addendum to an Archaeological Survey of the Proposed Lewis Road Improvements

As part of construction coordination with the City of Powder Springs, some minor modification to the proposed improvements within the boundaries of the Powder Springs Park.

Cobb 2009
5382 Blackwelder, Jon R., Pietak, Lynn Marie Ph. I Arch. Survey of Semmes Street Improvement Project, Fulton County

No existing or eligible National Register resources were located within the project's area of potential environmental effect.

Washington 2002
5403 Blackwelder, Jon R., Pietak, Lynn Marie Phase I Survey of Rays Road Sidewalk Location, Dekalb County

No existing or eligible National Register resources were located within the project's area of potential environmental effect.

Floyd 1992
5793 Blackwelder, Jon R. Addendum to the Phase I Archaeological Survey of the Proposed Perimeter Activity Center-ITS Upgrades and System Expansion/Congestion Reduction and Traffic, DeKalb and Fulton Counties, Georgia

The following seven locations, all located in DeKalb County, have been identified by the Perimeter Community Improvement Districts (PCIDs), City of Brookhaven, City of Dunwoody, and City of Sandy Springs as high priority for Advanced Transportation Management System (ATMS) related upgrades.

Fulton 2002
5882 Blackwelder, Jon R. Addendum to Phase 1 Archaeological Survey for the Proposed Bridge Replacement of CR 246/Brownwood Road over Big Indian Creek, Morgan Coutny, Georgia

Project CSBRG-0007-00(394) consists of replacing the structurally deficient, existing bridge on CR 246 over Big Indian Creek in Morgan County, Georgia. The total project length is approximately 1,700 feet beginning at M.P. 5.690 and extending to M.P. 6.040.

Fulton 1985
5884 Blackwelder, Jon R. Addendum to the Phase 1 Archaeological Survey of the Proposed Hatcher Point Road Improvements, Ware Coutny, Georgia

The original proposed project would consist of the widening of Hatcher Point Road from the existing two-lane section to a five-lane urban section with a two-way center turn-lane, curb and gutter, and sidewalk.

Fulton 2010
5885 Blackwelder, Jon R. Phase 1 Archaeological Survey of the Capps Ferry Bridge Over the Chattahoochee Rivers-Emergency Project (Fulton), Fulton County, GA

The proposed project would restore the eastern bridge foundation and stabilize the embankment, which resulted from washouts during the flood event in September 2009.

Clarke 1973
5892 Blackwelder, Jon R. Addendum to the Archaeological Survey of the Proposed Big Indian Creek Bridge Replacement, Morgan County, Georgia

On August 16, 2010, field staff from Edwards-Pitman Environmental, Inc.

Clay 1996
Displaying 11 - 20 of 125