7552
|
Blackwelder, Jon R.
|
Phase I Archaeological Survey of the Proposed SR 368/Anderson Highway Bridge Replacement Over Pickens Creek, Elbert County, Georgia
|
In November 2012, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey (P.I. No. 0009863; HP No. 111027-001) for the proposed State Route (SR) 368/Anderson Highway bridge replacement project in Elbert County, Georgia.
|
Elbert
|
1996
|
7567
|
Hise, Alana, Blackwelder, Jon R.
|
Phase I Archaeological Survey for the Abbotts Bridge Road Sidewalks, Fulton County, GA
|
The proposed project would increase pedestrian safety and mobility along SR 120/Kimball Bridge Road/Abbotts Bridge Road in the City of Johns Creek, Georgia.
|
Putnam
|
0
|
7768
|
Blackwelder, Jon R.
|
Phase I Archaeological Survey of the Watson Mill Mitigation Site, Madison County, Georgia
|
During April 2011 , Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the Watson Mill Mitigation Site (P.l. No. 0009828). The project tract is located southwest of Carlton in Madison County, Georgia, and consists of approximately 100 acres.
|
McIntosh
|
2012
|
7806
|
Blackwelder, Jon R.
|
Phase I Archaeological Survey of Diverging Diamond Interchange Improvements at Jimmy Carter Boulevard and I-85, Gwinnett County, Georgia
|
During February and March 2011, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey for the diverging diamond interchange improvements at the intersection of Jimmy Carter Boulevard and Interstate (I) 85 in Gwinnett County, Georgia (Project TIP No.
|
Peach
|
2007
|
7824
|
Blackwelder, Jon R., Hunt, Michael
|
Second Addendum to Phase I Archaeological Survey of Gulfstream Road Widening, Chatham County, Georgia
|
GDOT Project CSMLP-0008-00(275) is located approximately 0.9 mile west of Port Wentworth, Chatham County, Georgia. The proposed project would improve the intersection of Gulfstream Road/Crossgate Road and State Route 21 (SR 21).
|
Twiggs
|
1999
|
7836
|
Blackwelder, Jon R., Pietak, Lynn Marie
|
Phase I Archaeological Survey of Briarcliff Road at LaVista Road Intersection Improvements, DeKalb County, Georgia
|
The purpose of this project is to improve traffic operations at the intersection of SR 236 (LaVista Road) and SR 42 (Briarcliff Road).
|
Cherokee
|
2003
|
7899
|
Pietak, Lynn Marie, Blackwelder, Jon R.
|
Phase I Archaeological Survey of Johnson Ferry Road Improvements, Fulton County, Georgia
|
The proposed alternative constructs two separate east/west corridors that can operate independent of each other.
|
Chatham
|
2012
|
7970
|
Blackwelder, Jon R.
|
Phase I Archaeological Survey of the Proposed Perimeter Activity Center-ITS Upgrades & System Expansion/Congestion Reduction and Traffic, DeKalb and Fulton Counties, Georgia
|
|
Stewart
|
1974
|
7978
|
Blackwelder, Jon R.
|
Phase I Archaeological Survey for the Clarkston Streetscape and Pedestrian Enhancement Project, DeKalb County, Georgia
|
The proposed project would construct streetscape improvements within the City of Clarkston on East Ponce de Leon Avenue, Market Street, Rowland Street, and Norman Streets.
|
Gwinnett
|
2012
|
7997
|
Pietak, Lynn Marie, Blackwelder, Jon R.
|
Phase I Archaeological Survey of SR 9 from Upper Hembree Road to Windward Way, Fulton County, Georgia
|
This project is within the City of Alpharetta, Fulton County, and consists of the widening and reconstruction of SR 9, reconfiguration of sideroads, pedestrian improvements and signal upgrades. The work is divided into two projects, PI 721790 and 721780.
|
Gordon
|
1996
|