Back to top

CSSTP-M03-00(418), P.I. M003418 Decatur County Resurfacing Project

Author(s)
Report Number
9636
Year of Publication
2005
Abstract

This project proposes the leveling, resurfacing, 4' shoulder building and 2' shoulder paving of SR 38 beginning at the Decatur/Seminole County Line and ending at SR US 27. All work will take place within the existing right-of-way with no new right-of-way required. Total project length is approximately 10.195 miles. Pursuant to the February 2000 Memorandum of Understanding (MOU) between the Federal Highway Administration (FHW A), the State Historic Preservation Officer of the Georgia Department of Natural Resources (SHPO), and the Georgia Department of Transportation, this project is considered an undertaking as defined in 36 CFR 800.16(y), however, it has been determined there is no potential to affect historic properties included in or considered eligible for inclusion in the National Register of Historic Places.